Stack Sequence CHANGE for 400 Building

 

After verifying the pipe configurations of the return mains above the ceilings of the 23rd floor of the 400 building, Gilbert Mechanical recommends adjusting the sequence of work in stacks to reduce the number of full-building water shutoffs.  This adjustment in sequence has the added benefit of working on the stacks that are S, and W facing. These stacks are the warmest and have the highest rate of unit failures.  We appreciate the flexibility of residents in the 400 building to eliminate water shut offs for the entire building.   The 410 Building schedule remains the same.

 

 

 

 

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

I'm busy working on my blog posts. Watch this space!

Please reload

Recent Posts

July 3, 2020

June 26, 2020

June 19, 2020

June 11, 2020

June 5, 2020

May 29, 2020

May 22, 2020

May 14, 2020

April 30, 2020

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square