Weekly Work Update

April 3, 2020

HIA UPDATE – April 3, 2020

 

HIA Project Work

Please be informed that all of the trades for HIA Project are abiding by the Governor’s directive to Shelter in Place. At this point, the trades plan to resume work on Monday, April 13th.  As an added safety measure, the freight elevators in each building will be designated exclusively for HIA Project workers to use.  Gilbert will be sanitizing the elevator when they lock it off at 7:00 a.m. and before they release it for the day at 3:30 p.m.  This measure is being taken to protect the residents and the workers. 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

I'm busy working on my blog posts. Watch this space!

Please reload

Recent Posts

July 3, 2020

June 26, 2020

June 19, 2020

June 11, 2020

June 5, 2020

May 29, 2020

May 22, 2020

May 14, 2020

April 30, 2020

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square