HIA UPDATE – March 20, 2020

 

City of Minneapolis HIA Public Hearing Letter-UPDATED

The City of Minneapolis will be mailing an HIA Public Hearing letter to Summit House residents as soon as they determine how they will hold the required public hearing with the current COVID-19 Pandemic.   The Public Hearing will be a time for homeowners to make comments.  There will be no question/answer session. 

 

Summit House Resident Units-Fan Coil Replacement Schedule*

 

 

 

 

 

Typical Work Sequence in Units*

 

  • Plastic room protection installed and cabinet removal

  • Fan coil unit removal

  • Wall board removal for piping access

  • Abatement

  • Cable removal

  • Removal of existing pipes

  • New electrical rough-in

  • New piping rough-in

  • New controls rough-in

  • Testing and inspections

  • Pipe insulation

  • Wall replacement and patching

  • Install and connect fan coil unit

  • Prime paint new wall section

  • New cabinetry installation

  • Removal of plastic room protection

*Please Note: Many of these activities will be completed during the same day/week to reduce the time spent in each unit.  After cabinet installation the homeowner will be able to paint/wallpaper.  Association is responsible for replacement of walls.  Homeowner is responsible for any wall finishes.

 

* Pending additional updates, all in-unit work has been suspended until further notice because of COVID-19 and we will keep homeowners updated regularly involving any contemplated changes based on CDC and State-mandated guidelines.

 

HIA Petitions-8 More Needed-Please

Please be informed that Summit House is currently has 87% in HIA Petitions of HIA support. We would really like to go into the HIA Public Hearing Meeting with 90% in support.  We’re asking everyone who supports HIA and has not turned in a petition to please do so. The petition can be dropped off at the office, emailed to christine.paben@fsresidential.com or texted to Doug Strandness at 651-4027824.  Thank you!

 

HIA Contract

The Board will be signing the final contract agreement with LS Black for the exterior roofing, pool deck and garage work.  This will engage the remaining major component of the HIA project.

 

Share on Facebook
Share on Twitter
Please reload

Featured Posts

I'm busy working on my blog posts. Watch this space!

Please reload

Recent Posts

July 3, 2020

June 26, 2020

June 19, 2020

June 11, 2020

June 5, 2020

May 29, 2020

May 22, 2020

May 14, 2020

April 30, 2020

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square