July 25, 2017

The Façade Investigation has been rescheduled for Friday, July 28th due to the high wind conditions with the lift machine.  The scope of the rescheduled inspection is as follows:

  • 410 Building-Will be inspected first starting at 9:00 a.m.  The east, south and west si...

July 17, 2017

Scope visual inspections will be July 17th.

Lift visual inspections will be July 25th.  Please no parking in the parking lot at the 410 building from 8:30am until 4:30pm July 25th.

Please see below for an email sent from the engineering firm for further clarification on...

Please reload

Featured Posts

I'm busy working on my blog posts. Watch this space!

Please reload

Recent Posts

July 3, 2020

June 26, 2020

June 19, 2020

June 11, 2020

June 5, 2020

May 29, 2020

May 22, 2020

May 14, 2020

April 30, 2020

Please reload

Archive
Please reload

Search By Tags

I'm busy working on my blog posts. Watch this space!

Please reload

Follow Us
  • Facebook Basic Square
  • Twitter Basic Square
  • Google+ Basic Square